PATENT PENDING

HPDM-90S

90 kW High Power Density Machine - Submerged Cooling (HPDM-90S)

GET STARTED

90kW submerged propulsor

The HPDM-90S is an advanced marine propulsion system designed for unmanned surface vessels, hydrofoiling craft, and submerged pod drives. It has a compact 110 mm diameter that minimizes drag and maximizes hydrodynamic efficiency, along with an integrated inverter and direct submerged cooling to simplify installation and reduce system complexity. The system provides over 160 Nm of torque up to 5500 RPM (92 kW of power). It operates quietly, efficiently, and is suitable for stealth missions and high-end marine applications.

Key Features

HPDM-90S Specifications

Max Continuous Power
92 kW
Max Continuous Torque
(at Max Speed)
160 Nm
Max Speed
5500 RPM
Mass
25 kg
Peak Efficiency
94 %
HVDC Bus Voltage
200-450 VDC
Diameter
110 mm
Length
695 mm
Operating Temperature
-3 - 40 °C
Thermal Management
Direct submerged cooling
Bearing Grease Life
5000 hrs
(at 2500N of thrust)
Bearing Thrust Load Rating
2500 N
Propeller Shaft Interface
1" SAE Taper (marine standard)
Communication Protocol
CAN
Control Modes
Torque, Speed
These specifications, the power/torque curves, and the efficiency map are approximate, based on dynamometer data and simulation. Contact H3X to determine suitability for your application.

Get in Touch

To streamline communication and help us identify the best product for your application, please fill out our intake form below.

GET STARTED